The Ergosphere
Thursday, November 06, 2014
 

We must all be dead! Harvey Wasserman said so!

Do you recall the PSR hysteria about the unloading of SNF from Fukushima Dai'ichi Unit 4, and how it was a deadly threat to all life on earth, the "most dangerous moment since the Cuban Missile Crisis"?  (Older post, later update.)

Well, I must announce that Wasserman's worst nightmare must have come true.  TEPCO announced that all spent fuel has been removed from the Unit 4 fuel pool, leaving only 180 unused fuel elements (unused fuel is safe to handle by hand).  Since we were told that it was impossible to handle this job safely yet we heard nothing of this, it stands to reason that it killed us all in our sleep, and we are in some dreary Hadean afterlife in which we continue to go through the motions of existence without any knowledge of what happened to us.

It must be some dreadful thing like this, because Harvey Wasserman, PSR, UCS, etc. could not possibly have been wrong.  Could they?

Labels: , , , ,

 
Saturday, March 01, 2014
 

Naoto Kan directly responsible for Fukushima meltdowns?

This was posted at Hiroshima Syndrome, but because the blog format does not allow permalinks to specific content I'm going to quote the entire March 1 2014 entry below.  Do not skim, read every word.

March 1, 2014
Naoto Kan’s crime against Japan
This past week, a court panel in Tokyo rejected a criminal suit against former PM Naoto Kan concerning his actions during the first week of the Fukushima accident. Kan and five other officials allegedly caused the premature deaths of numerous people due to the chaotic Fukushima Daiichi evacuation. The panel said they could find no proof of the claim. I was waiting to see how the case would turn out before writing what follows. If criminal charges would have been filed, my opinion would be little more than adding insult to injury. I no longer feel this constraint.
There are numerous detailed reports concerning what happened at Fukushima, including my E-book Fukushima: The First Five Days. All of these sources show that soon after midnight of March 12, 2011, Naoto Kan made an executive decision. In my opinion, the events caused by Kan’s decision warrant criminal charges being brought against him, but not for the evacuation. His decision may have been the main reason for the severity of meltdowns with units #1, 2 & 3, and the sole cause of the hydrogen explosions at units #1, 3 & 4.
At ~12:20 am, site manager Yoshida wanted to begin the work of manually depressurizing unit #1 and asked the company’s home office for permission. Tepco-Tokyo dutifully forwarded the request to Kan, who’s approval should have been a perfunctory “yes”.  However, Kan told them to not depressurize until (1) the entire 3km radius’ evacuation was confirmed, and (2) a 3pm Press conference in Tokyo was held to announce the impending depressurization. The Press conference was held at 3:06am, but the 3km radius could not be confirmed as evacuated until ~9am. I firmly believe these politically-mandated delays are the prime reason for the full core-relocating meltdown of unit #1 and the hydrogen explosion which decimated the upper story of the Reactor Building at 3:36pm. If these delays had not been ordered by Kan, the full meltdown could well have been mitigated and the building explosion completely avoided.
The records kept by the staff and management team at F. Daiichi show that at 10pm on March 11, control room indication for reactor water level had been energized and there was more than 20 inches of water above the top of the fuel core inside unit #1. The meltdown could not have yet begun with that much water in the core. However, reactor building radiation levels were increasing. By 11pm, radiation levels at the Turbine Building access were increasing, as well. It may have been at this point that the fuel inside the reactor was beginning to be uncovered. But, as long as there was any water and steam inside the RPV, it is unlikely than a full meltdown would happen. When the actual melting of the core began is speculative, at best, but it does not seem to have begun before midnight. Soon after midnight, site manager Yoshida ordered the staff to prepare to depressurize the Primary Containment structure surrounding the reactor itself. The lower pressure would allow low pressure fire pumps to inject cooling water into the core and stop the progression of core damage. Local authorities said the 3km radius was fully evacuated at 12:30am, so Yoshida wanted depressurization to begin in earnest. They needed Tokyo’s approval. At 1:30am they were told of Kan’s two criteria for depressurization by Tepco-Tokyo.
It is quite likely that if the depressurization of unit #1 would have happened at 1:30pm, the amount of fuel melting in the core would have been severe, but a full core relocation unlikely. Some hydrogen may have begun seeping out of the PCV and into the outer reactor building. However, it is unlikely that the hydrogen level in the outer building would have been sufficient for the later-in-the-day explosion. When the actual depressurization occurred at ~ 10am, the fuel core was fully melted and had relocated to the bottom head of the pressure vessel. Also, large volumes of hydrogen gas had entered the outer reactor building in sufficient quantity to cause the subsequent explosion. The depressurization was way, way too late. The person most responsible for this situation was Naoto Kan.
The explosion with unit #1 came just six minutes after a high-voltage mobile diesel had begun sending electricity into unit #1. The staff was on the verge of starting the high-pressure Standby Liquid Control (SLC) system which would have been able to inject water inside the RPV. Flying concrete shards from the hydrogen explosion shorted out the heavy-duty cable that has been spliced between the diesel and a switchboard inside the reactor building. Flying debris also smashed into the diesel and knocked it out of commission. If it were not for the unit #1 hydrogen explosion, it is safe to say unit #1 would have been in a safe condition rather quickly, and unit #2 re-energized through tandem-unit interconnections soon there-after. If the depressurization would have been allowed at ~1:30am on March 12, 2011, it is probable that unit #1’s fuel damage would have been stanched at the partial/severe meltdown stage and the unit #1 hydrogen explosion would never have happened! Further, it is likely that unit #2 would have completely avoided meltdown since the fuel core did not begin to uncover until around 4:30pm on March 14th! In fact, unit #2 did not lose its steam-powered emergency cooling pumps (RCIC and HPCI) until a few hours before the core began to uncover. If there had been no unit #1 explosion, there would have been no fuel melting and relatively minor fuel bundle damage.
It is possible that unit #3 could have been saved, as well. A second high-voltage mobile diesel was on its way to unit #3 from units #5&6, when the unit #1 explosion occurred. The road was damaged by the earthquake and tsunami debris had to be removed as the diesel made its way down from the two undamaged unit on the bluff above units #1 through #4. It was a slow go. When unit #1 exploded, there was even more debris to clear than before, making the trip even slower. About half of the spool of heavy-duty cable used to splice the first diesel into unit #1 remained. The balance of the cable could have been used to connect the second diesel with unit #3 and reenergized the emergency cooling systems. The flow of water into unit #3’s core was not terminated until 2:42am on March 13th. The meltdown probably didn’t begin until after that time. Thus, unit #3 might have been saved if not for the hydrogen explosion with unit #1 at 3:36pm on March 12.
Kan would argue, I’m sure, that he ordered the delays to insure that no member of the public would be exposed to the radioactive gasses released by depressurizing unit #1. However, the wind was blowing out to sea on March 11th and was projected to stay that way for at least two days, which was not unknown to Kan and his emergency team in Tokyo. Real-time meteorological data from a computerized system, acronym SPEEDI, was available to Kan the entire time, but he negligently chose to ignore it because he felt  meteorological forecasting was inherently inaccurate.
Clearly, Kan panicked and gave orders that exacerbated the severity of the accident. He more than “meddled” - he criminally interfered! While we cannot say that Naoto Kan’s negligence caused the Fukushima accident, it seems that we can point a guilty finger at the former PM and say that he was the primary reason for the severity of the accident and the one person most responsible for all three hydrogen explosions. In my honest opinion, he should be criminally indicted for executive malfeasance, meddling in the emergency actions at F. Daiichi, placing the station’s entire staff in an un-necessary state of danger, and causing completely avoidable anguish to be inflicted on the people of Japan.

Labels: ,

 
Tuesday, January 28, 2014
 

The Fukushima Dai'ichi Unit 4 tragedy continues

TEPCO has announced that 220 fuel bundles have been transferred from the Unit 4 fuel pool to the common storage pool, roughly 1/8 of the total.  Despite this, the islands of Japan, the west coast of the USA, and the world in general remain habitable.

This on-going tragedy affects the scaremongers, whose credibility may be irreparably damaged by this continuing state of normality.   Perhaps they can blame the Polar Vortex and California drought on Fukushima, and we can all breathe a sigh of relief that our media has not lost the ability to scare us about SOMETHING.


Labels: , , ,

 
Friday, November 22, 2013
 

The unfolding tragedy at Fukushima Dai'ichi Unit 4

I feel it's time to expand on the analysis of Harvey Wasserman on the spent fuel issue.  As he says, "We are now within two months of what may be humankind’s most dangerous moment since the Cuban Missile Crisis."

In a terribly dangerous process, 22 fuel elements from the Fukushima Dai'ichi Unit 4 spent fuel pool came within mere light-years of causing the end of all life on earth.  Lifted one at a time from their protecting racks, they came several crucial meters closer to the top of the water pool which is the only thing keeping them wet.  Then, in a maneuver fraught with tedium, they were laid vertically in a cask already placed at the bottom of the pool.  This process was repeated a harrowing 22 times over 2 days at the blistering average pace of more than one per hour.  This cask was then sealed and lifted from the pool and away from the building by a crane.  The cask fell toward the ground at a rate of inches per second, coming to rest at the last moment in a cradle atop a flat bed truck.

It did not end there.  The truck proceeded to careen about the site at the rate of several miles per hour until it came to the common fuel pool at the F. Dai'ichi site, where the threat of encountering a pebble or running over an insect finally ended.  The cask was again thrown through the air, whipped about at inches per second at the end of fragile steel cables, until it came to rest at the bottom of another pool of water in a miraculously undamaged state.  The dangerous cask-sealing process was reversed in a dangerous cask un-sealing process, and the harrowing transfer of fuel rods was repeated in mirror-image from cask to rack.  Each bundle of rods was observed to strike its supporting rack stops, which physical contact is expected to continue indefinitely or until the fuel, the Sun, or the universe explodes.

This tragic lack of bad news means that the dream of ending humanity's use of nuclear energy remains out of reach.  TEPCO expects to repeat these steps more than 160 times to empty the Unit 4 fuel pool.  Mr. Wasserman's forecast of nuclear armageddon is bound to be satisfied sometime.  He has years and years for his predictions of catastrophe to finally come true.

UPDATE:  TEPCO videos can be found here.  Note the blistering, inches-per-second pace of work!

Labels: , ,

 
Talk largely about energy and work, but also politics and other random thoughts


Mail Engineer-Poet

(If you're mailing a question, is it already in the FAQ?)

Important links

The FAQ
Glossary
The Reference Library

Blogchild of

Armed and Dangerous

Blogparent of

R-Squared




The best prospect for our energy future:
Flibe Energy

ARCHIVES
January 1990 / February 2004 / March 2004 / June 2004 / July 2004 / August 2004 / September 2004 / October 2004 / November 2004 / December 2004 / January 2005 / February 2005 / March 2005 / April 2005 / May 2005 / June 2005 / July 2005 / August 2005 / September 2005 / October 2005 / November 2005 / December 2005 / January 2006 / February 2006 / March 2006 / April 2006 / May 2006 / June 2006 / July 2006 / August 2006 / September 2006 / October 2006 / November 2006 / December 2006 / January 2007 / February 2007 / March 2007 / April 2007 / December 2007 / January 2008 / May 2008 / June 2008 / August 2008 / October 2008 / November 2008 / December 2008 / February 2009 / March 2009 / April 2009 / May 2009 / June 2009 / July 2009 / August 2009 / September 2009 / October 2009 / November 2009 / December 2009 / January 2010 / April 2010 / May 2010 / June 2010 / July 2010 / August 2010 / September 2010 / October 2010 / November 2010 / December 2010 / January 2011 / February 2011 / March 2011 / April 2011 / May 2011 / July 2011 / August 2011 / September 2011 / October 2011 / April 2013 / November 2013 / December 2013 / January 2014 / February 2014 / March 2014 / April 2014 / July 2014 / August 2014 / September 2014 / October 2014 / November 2014 / February 2015 / April 2015 / October 2015 / March 2016 / April 2016 / May 2016 / June 2016 / July 2016 / November 2016 / December 2016 / February 2017 / May 2017 / June 2017 / September 2017 / October 2017 / November 2017 / March 2018 / May 2018 / June 2018 / October 2018 / December 2018 / January 2019 / March 2019 / June 2019 / October 2019 / November 2019 / March 2020 / June 2020 / December 2020 / March 2021 / April 2021 / May 2021 / July 2021 / January 2022 / February 2022 /


Powered by Blogger

RSS feed

Visits since 2006/05/11: