The Ergosphere
Saturday, November 30, 2013
 

The EOS grid-storage system and nuclear power: a marriage made in heaven

EOS Energy Storage is peddling a megawatt-scale, fully containerized energy storage solution based on zinc-air (or zinc-oxygen?) cells.  Self-contained in a standard 40-foot footprint, the cutaway shows blocks for batteries, inverters, and cylindrical objects which seem likely to be some sort of gas storage or perhaps filtering/processing system.  The stated performance figures:

This appears designed to operate roughly 1 cycle a day for 3 decades.

If they actually deliver at those specs, it's worth thinking about what it could do.  For instance, at $1000/kW output and 75% round-trip efficiency, $300 million invested plus 2400 MWH input over 6 hours (400 MW) yields 1800 MWH output (300 MW) over 6 hours.

Let's try this as a hypothetical example with something else that's already coming:  the AP1000, with 8 currently being constructed worldwide.  This will supply base-load power which can be cycled to follow load, but is most economical if it's run flat-out.  The AP-1000 is rated at 1154 MW(e), and the estimated pricetag per plant of about $8 billion at Vogtle isn't out of line for first-of-a-kind efforts.... batteries not included.

Let's add them.  $300 million for 300 MW of EOS units bumps the pricetag to $8.3 billion.  Charging at full power drops the net output from 1154 MW(e) to 754 MW(e).  Maximum discharge increases the net output to 1454 MW(e), nearly twice the minimum.  (This is considerably greater than the 1.67:1 day/night swing detailed for the eastern provinces of Australia.)

At full cycling, the daily output is (1154*24-600)=27096 MWh, or 1129 MW(e) average.  Other attributes:



Amortizing $8.3 billion over 20 years at 7% interest costs $772 million/year; divided over 1129 average MW at 0.9 capacity factor, I get 8.7¢/kWh.  Selling off-peak power at 5¢, mid-demand at 9¢ and peaking power at 15¢ I calculate $913 million annual revenue vs. $772 million annual amortization (salaries and fuel not included).  Even at the extreme first-of-a-kind price of $8 billion for the nuclear unit, this is clearly affordable.  After 20 years the bonds are paid off and the system becomes a cash cow for likely 4 more decades or longer.

The value added by the battery is the difference in purchase (or opportunity) cost of the off-peak power and the sales price of the peaking power.  At the same 0.9 capacity factor I see $49.3 million annual gross revenue from the battery, paying off in just over 8 years.  Plainly the battery is pulling its fiscal weight!  But it will also cut the supply of off-peak power (shifted to charging), so off-peak prices may increase.  This would further improve the economics of the system as a whole.


The impact on unreliables


Would the EOS battery make the dream of an all-renewable grid possible?  That's very doubtful, given the need to tide the system over lulls adding up to days of average output.  48 hours of storage would itself cost $8000/kW, or around 16¢/kWh even if it was cycled continuously (50% capacity factor).  That's over and above the cost of the power to charge it, which is hardly cheap at feed-in tariff rates.  What would people do, looking at that pricetag to go "green"?  They'd go the way of Germany and Poland, and burn coal.  If stored energy comes at caviar prices, we should not be surprised if people decide to eat energy "junk food" instead.

The impact of a carbon tax


Suppose for a moment that the current system of production and investment tax credits is replaced by a simple, non-discriminatory figure of merit:  a straight-up carbon tax.  Let's set this carbon tax at $40/ton of CO2, which matches the 2.2¢/kWh PTC for a gas-fired generator emitting 550 gCO2/kWh.  Coal plants will be assumed to emit 900 gCO2/kWh, with coal at 15 million BTU and $100/ton delivered (average bituminous and sub-bituminous).  Also, with the North American shale-gas investment bubble about to collapse and multiple LNG export terminals ready to push prices up to world levels, wholesale NG delivered to major markets costs $15/mmBTU.

This was worth working through in detail, so I posted the spreadsheet in both text and downloadable file at ergosphere.wordpress.com.  This spreadsheet assumes a grid capable of delivering 600 GW average, to allow expansion for electrification of transport etc.  I used a 20-year amortization for all RE generation (wind farm lifespan appears to be shorter than that), 30 years for nuclear (licenses are now being extended to 60 years), 7% interest rate, and highly decentralized and interconnected networks for both wind and solar generation.  Without storage the RE must be consumed at the time of generation, so transmission capacity must equal peak generating capacity.  I assumed cost of $2 million per mile for a ±1.2 megavolt, 1000 A (2.4 GW) dual-circuit HVDC line with an average of 1800 miles length between generation and market.  That's enough to get Dakota wind power to the coasts, and Arizona and New Mexico solar power to both Seattle and Georgia.  I also rolled in a $40/tCO2 carbon tax for the fossil-backed options, with emissions of 550 g/kWh for gas and 900 g/kWh for coal.  In the all-RE case, some 2.3 million miles of HVDC line are required.  Some of these may be able to share rights-of-way; some may not.  This many times the total mileage of the Interstate highway system.  I assumed for the sake of simplicity that fossil-backed RE could use DSM to use peak generation productively and would require neither storage nor spillage.

The cost figures for the RE options are all dismal.  Gas-backed is cheapest at $114/MWh (11.4¢/kWh), with coal not far behind.  The gas option emits 122 gCO2/kWh, which is at least twice what we can tolerate in the long term.  Getting this down using storage is staggeringly expensive.  Using the EOS zinc-air system at $167/kWh, total cost soars by a factor of almost 10 and power rises to a prohibitive 90¢/kWh.

The nuclear option comes in best.  Assuming $5000/kW average for a new-build fleet of nuclear reactors (roughly twice China's cost for a new AP1000), and 180 GW (1200 GWh) of EOS battery storage, total capital cost is about $3.3 trillion.  No HVDC network is required.  Amortization over 30 years at 7%/year is $270 million.  Total amortization cost comes to 5.1¢/kWh.  Carbon taxes are zero, so the only unknown is O&M at perhaps 2-3¢/kWh.  CO2 emissions from operations are ZERO.

The nuclear system does not depend on natural energy flows, so it can be expanded when and where desired.  For each new application electrified on this grid, all the carbon it formerly emitted is displaced.  This appears to be a cost-effective way to de-carbonize entire national economies.

This would be anything but a small task.  632 GW of AP1000's is 575 units, not allowing for refueling and repair outages.  Even so, building 30 a year the USA could finish the job in 20 years.  The alternative is to build something like SMRs, where we'd be turning out several a week instead of one every couple of weeks.  That looks doable too.

Conclusion


Trying to de-carbonize the US grid with enough excess to electrify transportation is a massive task.  The cost of the all-renewable scenarios for doing it, with the requirements needed to provide a reliable supply to dark/calm parts of the country, is prohibitive.  Nuclear energy and the energy stockpile of fissile metals eliminates both the long-distance interconnections and massive storage needed for reliance on fickle energy flows.  If we want to go green, nuclear is the only real option we have.

Labels: , , , , , ,

 
Friday, November 22, 2013
 

The unfolding tragedy at Fukushima Dai'ichi Unit 4

I feel it's time to expand on the analysis of Harvey Wasserman on the spent fuel issue.  As he says, "We are now within two months of what may be humankind’s most dangerous moment since the Cuban Missile Crisis."

In a terribly dangerous process, 22 fuel elements from the Fukushima Dai'ichi Unit 4 spent fuel pool came within mere light-years of causing the end of all life on earth.  Lifted one at a time from their protecting racks, they came several crucial meters closer to the top of the water pool which is the only thing keeping them wet.  Then, in a maneuver fraught with tedium, they were laid vertically in a cask already placed at the bottom of the pool.  This process was repeated a harrowing 22 times over 2 days at the blistering average pace of more than one per hour.  This cask was then sealed and lifted from the pool and away from the building by a crane.  The cask fell toward the ground at a rate of inches per second, coming to rest at the last moment in a cradle atop a flat bed truck.

It did not end there.  The truck proceeded to careen about the site at the rate of several miles per hour until it came to the common fuel pool at the F. Dai'ichi site, where the threat of encountering a pebble or running over an insect finally ended.  The cask was again thrown through the air, whipped about at inches per second at the end of fragile steel cables, until it came to rest at the bottom of another pool of water in a miraculously undamaged state.  The dangerous cask-sealing process was reversed in a dangerous cask un-sealing process, and the harrowing transfer of fuel rods was repeated in mirror-image from cask to rack.  Each bundle of rods was observed to strike its supporting rack stops, which physical contact is expected to continue indefinitely or until the fuel, the Sun, or the universe explodes.

This tragic lack of bad news means that the dream of ending humanity's use of nuclear energy remains out of reach.  TEPCO expects to repeat these steps more than 160 times to empty the Unit 4 fuel pool.  Mr. Wasserman's forecast of nuclear armageddon is bound to be satisfied sometime.  He has years and years for his predictions of catastrophe to finally come true.

UPDATE:  TEPCO videos can be found here.  Note the blistering, inches-per-second pace of work!

Labels: , ,

 
Talk largely about energy and work, but also politics and other random thoughts


Mail Engineer-Poet

(If you're mailing a question, is it already in the FAQ?)

Important links

The FAQ
Glossary
The Reference Library

Blogchild of

Armed and Dangerous

Blogparent of

R-Squared




The best prospect for our energy future:
Flibe Energy

ARCHIVES
January 1990 / February 2004 / March 2004 / June 2004 / July 2004 / August 2004 / September 2004 / October 2004 / November 2004 / December 2004 / January 2005 / February 2005 / March 2005 / April 2005 / May 2005 / June 2005 / July 2005 / August 2005 / September 2005 / October 2005 / November 2005 / December 2005 / January 2006 / February 2006 / March 2006 / April 2006 / May 2006 / June 2006 / July 2006 / August 2006 / September 2006 / October 2006 / November 2006 / December 2006 / January 2007 / February 2007 / March 2007 / April 2007 / December 2007 / January 2008 / May 2008 / June 2008 / August 2008 / October 2008 / November 2008 / December 2008 / February 2009 / March 2009 / April 2009 / May 2009 / June 2009 / July 2009 / August 2009 / September 2009 / October 2009 / November 2009 / December 2009 / January 2010 / April 2010 / May 2010 / June 2010 / July 2010 / August 2010 / September 2010 / October 2010 / November 2010 / December 2010 / January 2011 / February 2011 / March 2011 / April 2011 / May 2011 / July 2011 / August 2011 / September 2011 / October 2011 / April 2013 / November 2013 / December 2013 / January 2014 / February 2014 / March 2014 / April 2014 / July 2014 / August 2014 / September 2014 / October 2014 / November 2014 / February 2015 / April 2015 / October 2015 / March 2016 / April 2016 / May 2016 / June 2016 / July 2016 / November 2016 / December 2016 / February 2017 / May 2017 / June 2017 / September 2017 / October 2017 / November 2017 / March 2018 / May 2018 / June 2018 / October 2018 / December 2018 / January 2019 / March 2019 / June 2019 / October 2019 / November 2019 / March 2020 / June 2020 / December 2020 / March 2021 / April 2021 / May 2021 / July 2021 / January 2022 / February 2022 /